A selection of past projects to peruse showing the various stages of transformation – the before, the during and the end result.
Swan Street, Wollongong Shared Path
The site is located at Swan Street, Wollongong from the rail underpass to the intersection with Corrimal St. The scope…Oaky Bridge Construction of Wing Wall, Oak Flats
The site is located at Oak Flats, Shellharbour. The local council engaged Cadifern to complete the construction of new wing…Grand Pacific Walk – Clifton
The works were located at Lawrence Hargrave Drive, Clifton. The scope of works are but not limited to; demolition works,…Debris Control Structures
The Project included construction of new Debris Control Structures at three separate locations across the LGA in order to minimise…Cringila Hills Shared Path
The works were located at Cringila Hills Recreation Precinct. Cadifern was engaged to complete Stage 2 of shared path which…Fraternity Club Embankment Stabilization
The works includes but not limited to reinstating portion of collapsed creek embankment. Earthworks, embedment of large toe rock, import…Kayak Launch Facility at Shell Cove Marina
The Shell Cove Boat Harbour Precinct is located at Boollwarroo Parade, approximately 1km south of Shellharbour Village. The Kayak Launch…Puckey’s Estate – Boardwalks and Bridge Repairs
The condition of the existing infrastructure was posing a public safety hazard. The area was identified as having several key…23 Loftus St, Wollongong – Stormwater & Public Domain Works
Summary: Traffic/ pedestrian management plan Q.A, WHS & Environmental management Service Locating and conduit lowering Drainage Works Khan Lane Construction…Chellow Dene Ave, Stanwell Park – Brick Arch Culvert Rehabilitation
The arch culvert had been constructed form solid pressed clay bricks as part of the former south coast railway, the…ParQ on Flinders Sewer Works, Stormwater, Road Widening and External Civil Works
Summary Sewer Works Stormwater Works Road Widening External Civil WorksIris Avenue, Coniston – Split Carriageway Retaining Wall, Associated Earthworks and Drainage
A temporary concrete block retaining wall was constructed by Wollongong City Council back in 2017 following a localized slippage on…Shellharbour Boat Ramp Slipway Replacement
The Boat Ramp located on Town Street Shellharbour Village is a dual-lane concrete ramp into a relatively protected Harbour. The…Horsley Childcare Centre
Summary:Keira Mine Rd. Bank Rehabilitation and Drainage Upgrade
The Fairy and Cabbage Tree Creeks catchment is location within WCC LGA in the Illawarra Region of NSW. This catchment…