Upgrade of Bong Bong Road, Mittagong

Summary

  • Traffic/Pedestrian management
  • Service location and protection
  • 500m of road widening
  • 800m of new kerb and gutter
  • 270m of new stormwater pipe and pits
  • 180mm deep lift asphalt pavement
  • 800 m of new kerb and guttering
  • 250m of 1.5m wide reinforced concrete footpath
  • Adjustment of more than 20 residential driveways to suit new road levels
  • Carry out service adjustments to water and gas services
  • 54.5m of block retaining wall
  • Management of Safety, Environmental and Quality