Summary

Sewer Works

  • Implementation and management of WHS, EMS, Q.A and TMP
    Sewer Works – Keira St
    • Supply and Install DN225 uPVC SN8 sewer main
    • Supply and install MH
    • Connection to existing line
    • Road Reinstatement
  • Temporary Sewer Diversion Works
    • Temporary main to be connected to existing junction
    • Installation of temporary pipework outside edge of shoring wall
    • Intercept flow within Boundary
    • Replacement and concrete encasementof DN225 uPVC SN8
    • Install trafficable lid at existing MH

Stormwater Works

  • Survey Set Out
  • Service Location
  • Earthworks/ Stormwater Works
  • Construct Cast Insitu Pits
  • Sydney Water Connection to existing main
  • Site Restoration
  • Linemarking and Signage

Road Widening

  • Demolition works of existing concrete kerb and gutter, footpath and road
  • Supply and placement of subase and lean mix basecourse
  • Detailed excavation for road widening
  • Construction of medium strip
  • Supply and install asphalt
  • Kerb & gutter and footpath replacement works at Keira St. Smith St. Campell St. and Flinders St.
  • Linemarking

External Civil Works

  • Earthworks
  • Supply and placement of paving subbase and base
  • Supply and placement of vehicle entry
  • Placement of blinding under pavers
  • Detailed excavation of wall footings/ slab beams
  • FRP of wall footings and retaining wall beams
  • Bakfill of planter boxes