Summary
Sewer Works
- Implementation and management of WHS, EMS, Q.A and TMP
Sewer Works – Keira St- Supply and Install DN225 uPVC SN8 sewer main
- Supply and install MH
- Connection to existing line
- Road Reinstatement
- Temporary Sewer Diversion Works
- Temporary main to be connected to existing junction
- Installation of temporary pipework outside edge of shoring wall
- Intercept flow within Boundary
- Replacement and concrete encasementof DN225 uPVC SN8
- Install trafficable lid at existing MH
Stormwater Works
- Survey Set Out
- Service Location
- Earthworks/ Stormwater Works
- Construct Cast Insitu Pits
- Sydney Water Connection to existing main
- Site Restoration
- Linemarking and Signage
Road Widening
- Demolition works of existing concrete kerb and gutter, footpath and road
- Supply and placement of subase and lean mix basecourse
- Detailed excavation for road widening
- Construction of medium strip
- Supply and install asphalt
- Kerb & gutter and footpath replacement works at Keira St. Smith St. Campell St. and Flinders St.
- Linemarking
External Civil Works
- Earthworks
- Supply and placement of paving subbase and base
- Supply and placement of vehicle entry
- Placement of blinding under pavers
- Detailed excavation of wall footings/ slab beams
- FRP of wall footings and retaining wall beams
- Bakfill of planter boxes