HMAS Albatross has been expanding ever since the 1950’s.
As more capable aircraft have been acquired, ground support facilities have had to be built to accommodate.
We were very proud to have completed this scope as part of this major project at HMAS Albatross.
A well-known military base and airport home to the Naval Air Station (NAS) Nowra, NSW.
In 2014 Cadifern was engaged by a major contractor to carry out extensive stormwater works, hydraulic service installation, pits, tanks, culverts, purification and separation units, grates, pipes, concrete works, steel works, detailed excavation, and earthworks.
- 4.5 Kilometres of Culverts and RCP
- DN300 to DN1500
- 200+ Stormwater Pits
- Depths up to 6m