Summary:
- Landslip due to severe storm.
- RMS road at risk of collapse
- Provide Traffic Management
- Gain access down severely unstable treacherous slope
- Using anchor and winch system to track excavator to base of landslide
- Created a site specific materials handling system in difficult site conditions
Scope:
- Install geo fabric
- Install geo grid
- Build up in layers using granular materials
- Continue to build layers to a height of 1.2m
- Install large armour rocks
- Build retaining wall adjacent to road
- Install guard rail