The site is located at Lawrence Hargrave Drive, Austinmer. The slope was in an excessive 70 degrees and there was no drain capacity overall, the headscarp was severely unstable and appearing failure under loading or foot traffic.
Cadifern always strive to be pro-active in determining the best method of approach to their project.
Summary:
- Traffic/ pedestrian management plan
- QA/WHS/ENVIRONMENTAL Management Implementation
- Erosion and Sediment Control Implementation
- Earthworks and detailed excavation
- Construction of reinforced concrete footing
- Supply and Installation of 41m long, 3.5m high Massbloc Retaining Wall, Guardrail and Bollards
- Drainage works
- Asbestos Containing Material Management and Removal
- Service Relocation
The project was successfully completed in April 2018 within budget and programme. All relevant legal and other requirements were met