The condition of the existing infrastructure was posing a public safety hazard.
The works were completed by Cadifern in June 2017 the works were located at Lake Entrance Rd. Shellharbour, the scope of works includes but not limited to; traffic and pedestrian management, demolition of existing retaining wall, earthworks, slope stabilization preparation works, installation of geoweb, reno mattress, shotcrete treatment, construction of footpath, supply, and installation of fencing.
Cadifern has ranked Superior with Co-operation in contract delivery as they were always willing to assist Council achieve the project goals
Summary
- Traffic/ pedestrian management
- Q.A, WHS, Environmental management
- Demolition works
- Earthworks
- Erosion and Sediment Control Management
- Clear and Grubbing
- Bulk excavation of embankment
- Detailed excavation to strip footing for retaining wall
- General excavation works
- Geoweb slope protection
- Placement of Reno mattress
- Placement of Shotcrete on retaining wall
- Construction of footpath
- Services location
- Stormwater drainage installation
- Plant management
We maintained rigorous environmental compliance and safety standards throughout the project and met all relevant requirements successfully.